Name of the project:Decoration project of the conference room
|
Item
| Name of the project
| Quantity
| Unit
| Material
| Description of the Decoration process and materials
|
Unit price
(USD)
| Total price
(USD)
|
One
| Conference Room
|
1
| Ceiling
| 27.5
| m2
| 12
| 330
| 1. Install:make horizonal line,hung line,use the screw to fix the pole,in order to make the ceiling in a horizonal space. 2. Use the light steel frame for the ceiling. 3. Use screw to fix the space of 6cm AITE board,paint the nail to prevent rust.Use special bandge.
|
2
| Grill of the Air conditioner
| 2.28
| m2
| 62
| 141.36
| Order and provide the aluminum grill
|
3
| Tiles of the floor
| 25.5
| m2
| 32
| 816
| 1. 800x400mm floor tiles2. Portland 32.5MPa cement,pave with sand and mud.white cement to seal the seam.
|
4
| Decoration of the wall surface
| 41.95
| m2
| 48
| 2013.6
| Based on the construction drawing
|
5
| Ceiling/wall surface,rubdown,use the lighting and shine painting
| 75.5
| m2
| 1.4
| 105.7
| 1. Clean the wall surface 2. Use the environmently friendly painting, paint the botton once,and paint the surface twice. 3. Polish the wall. 4. Paint bottom once,and paint surface twice. 5. The price for single color paint only. 6. If different color,add one more color, add 60RMB.The same brand of paint.
|
6
| Glass partition
| 14.7
| m2
| 57
| 837.9
| 1.Use the steel frame,for some part,link up with iron. 2.15cm POLY board as base. 3.Order the buffing and stainless surface,12cm toughented glass.part of the glass is buffing.
|
7
| Glass door
| 1.7
| m2
| 74
| 125.8
| 1.12cm toughened glass,including the stainless steel door handle and other accessories.2.Paint 5P polyrester paint 8 times (botton 5 times and surface 3 times to get the best result)and buffing.3.Width of the door frame when opening ≤ 350mm
|
| Sub-total
| | | | 4370.36
| |
Two
| Project of electricity and water supply
|
1
| Install of the electricity supply
| 10
| Item
| | 0
| Use top brand wire.Use 1.5mm2 wire to make the lighting system,and 2.5mm2 wire to make the socket system.use 4mm2 wire to make the A/C system and water heater system.
|
4
| Install of the lighting
| 1
| Item
| 46
| 46
| Good installation of the lighting
|
5
| Electricial Wire used by the A/C and others
| 2
| Item
| 14
| 28
| 1. Including socket of the A/C,4mm2 wire,PVC cable trunk,and the control system of the A/C.
|
7
| Install of the TV wire and Network wire
| 3
| Item
| 13
| 39
| 1. Including all the materials to complete the installation.and a special wall-fix socket for TV is avaialble.
|
8
| Install of the Telephone wire
| 15
| m
| 0.8
| 12
| 1. Including all the materials to complete the installation.
|
10
| Install wire of the HI-FI
| 40
| m
| 2.5
| 100
| 1. Including all the materials to complete the installation.
|
| Sub-total
| | | | 225
| |
Three
| Furniture Part
|
1
| Conference chair
| 12
| Piece
| 43
| 516
| |
2
| Conference table
| 1
| Item
| 455
| 455
| |
| Sub-total
| | | | 971
| |
Four
| Electricial appliance and Lighting
| | | | |
1
| Spot light in square shape
| 18
| Item
| 7.3
| 131.4
| |
2
| T4 Light tube
| 45
| Meter
| 5.8
| 261
| |
3
| LCD TV
| 1
| Item
| 910
| 910
| TCL 32' LCD TV
|
4
| Projector
| 1
| Set
| 1010
| 1010
| SONY brand
|
| Sub-total
| | | | 2312.4
| |
| | | | | |
| Total(RMB)
| | | | 7878.76
| |
| | | | | | |
Remarks: All the materials used in the decoration are good quality and environmently friendly.Such as paintings,wires,water pipes,switchs and sockets,etc.
|